               This is the construction log (page 7) for my RANS S-6S Taildragger.

 
  17 Dec 09

Throttle and choke routing.
18 Dec 09

Connected the throttle cables.
03 Jan 10

IGN wire, EFIS harness, PTT
05 Jan 10

Fuel flow sensor. Master solenoid.
         
  7 Jan 10

Powered up the radio and EFIS
8 Jan 10

Safety wire on throttles
9 Jan 10

Bundled wiring and installed EGT probes.
14 Jan 10

Bundled wire. 12V plug. Horiz tail.
         
  15 Jan 10

Painted the panel and some parts.
18 Jan 10

Glareshield and coolant overflow.
19 Jan 10

Encoder Converter. Painted rivets.
9 Feb 10

Electric elevator trim.
         
  10 Feb 10

Rotax capacitor. TX wiring.
 
11 Feb 10

Wiring and glareshield.
15 Feb 10

Bottom coolant hose.
17 Feb 10

More elec. trim.
         
  21 Feb 10

Panel support bracket.
21 Feb 10 con't

ELECTRIC ELEVATOR TRIM
10 Mar 10

tx and glove box brace
11 Mar 10

Wheel pants!
         
  21 Mar 10

 
Wheel pants
23 Mar 10

Installed the panel dock!
27 Mar 10

GPS ON/OFF switch bellcrank.
3 Apr 10

GPS ON/OFF button.
         
  5 Apr 10

Mounted both wheel pants.
7 Apr 10

Leg fairings, prop, coolant, glareshield.
11 Apr 10

Battery wire and fuel drain.
14 Apr 10

Fiberglass and resin!
         
   