               This is the construction log (page 6) for my RANS S-6S Taildragger.

 
  20 Sep 09

Masked off the blue trim.
21 Sep 09

Painted the blue.
23 Sep 09

Red!!!
25 Sep 09

Baggage door/Engine mount
         
  26 Sep 09

elev push/pull tube
coolant radiator
27 Sep 09

Firewall and accessories
28 Sep 09

More firewall...
29 Sep 09

Firewall and tailwheel.
         
  29 Sep 09 (con't)

Interior pieces.
2 Oct 09

Left wingtip.
3 Oct 09

ENGINE INSTALL!!
09 Oct 09

Radiator hose

 
         
  10 Oct 09

Oil cooler and tank mount
15 Oct 09

Firewall. Battery cable. Fuel hose. Cabin heat.
16 Oct 09

Muffler heater and hoses.
17 Oct 09

Solenoid mount and 'patch'.
         
  18 Oct 09

Battery cables. Fuel hose. Interior.
29 Oct 09

Various odd things...
30 Oct 09

Center glareshield piece.
31 Oct 09

Right wing gap seals.
Panel labeling.
         
  1 Nov 09

Glove box door. TX brackets.
4 Nov 09

More panel...
8 Nov 09

More glove box work.
9 Nov 09

Left wing close-out rib.
         
  12 Nov 09

Pitot/Static lines
17 Nov 09

Wiring diagram
18 Nov 09

Wiring! And wing close-out rib screws.
19 Nov 09

Radio EFIS installed. More wiring.
         
   