This is the construction log (page 3) for my Rans S-6S Taildragger.


30 Aug 08
Finished the baggage frame and door.
Aux fuel tank install
31 Aug 08
Lower fuselage panel.
Flap cable.
2 Sep 08
Right wing ribs.
3 Sep 08
Rib stringers on right wing.
       
12 Sep 08
Left forward aluminum fairing.
Flaps and Ailerons.
20 Sep 08
Leading edge wrap.
Mounted aux fuel tank.
21 Sep 08
Closeout Rib.
Bonding leading edge wrap.
23 Sep 08
Various little things today...
       
24 Sep 08
Super-Fil on the leading edge.
Rough cut wingtip.
25 Sep 08
More Super-Fil.
Bonded leading edge of lower root skin.
27 Sep 08
Sanded second coat of Super-Fil.
8 Oct 08
Tail pieces ready to cover.
Vertical tail support.
Cowling.
       
9 Oct 08
Started covering today! Just did one side of the left elevator.
14 Oct 08
Covered left elevator
and left flap.
15 Oct 08
Added pinked tape.
16 Oct 08
Finished fabric on flap.
Finished right elevator.
       
17 Oct 08
Covered the right horiz stab.
29 Oct 08
Started covering rudder.
30 Oct 08
Covered rudder, ripped covering off!
3 Nov 08
Finished re-covering the rudder.
       
9 Nov 08
Doors and lexan.
10 Nov 08
Added the lexan to the left door. Started on door handles.
11 Nov 08
Battery box.
Antenna mounting plate.
11 Nov 08 (con't)
Mounted the engine mount and drilled the two lower holes.
       
12 Nov 08
Covered the bottom of the fuselage.
13 Nov 08
Mounted the ELT.
19 Nov 08
Finished the right side of the fuselage.
25 Nov 08
Adding 2" tape to fuselage.
       
 