RANS S-6S
               This is the construction log (page 2) for my RANS S-6S Taildragger.

 
  25 Mar 08

Put the tires on the rims
27 Mar 08

Tailwheel pieces.
Completed main wing spars
1 Apr 08

Wings and wing fittings
2 Apr 08

Fuel tanks and mounts
         
  2 Apr 08 (con't)

Wing ribs
 
3 Apr 08

More rib work
Fuel tank mounting brackets.
5 Apr 08

Left wingtip box
6 Apr 08

Wing tip box
Fuel tank fittings
Vertical Tail
         
  7 Apr 08

Vertical Tail Complete!
18 Apr 08

Gear legs. Fuel tank leak check
27 May 08

Mounted the comm antenna
6 Jun 08

Wingtip box mounted

 

         
  17 Jun 08

Started aligning the main gear legs
23 Jun 08

Wing tank is now mounted!
Working on the skins...
24 Jun 08

Aft rib clips
3 Jul 08

Floorboard and rudder pedals
         
  4 Jul 08

controls/rudder pedals/firewall
11 Jul 08

Controls.
16 Jul 08

Gear drilled out by
STA-Lite Aviation
17 Jul 08

Firewall, brakes, forward bottom aluminum
         
  20 Jul 08

Bottom stringers installed.
Started cutting and fitting interior pieces.
1 Aug 08

Interior pieces-still cutting and fitting
2 Aug 08

Rudder Cable, Elev Tube, Bushing
15 Aug 08

More interior work!
Plastic on fuselage longeron tubes.
         
  16 Aug 08

Horizontal stabs.
Dummy brake cylinders.
17 Aug 08

Elevator, flying wires, and more dummy brake cylinder.
24 Aug 08

Baggage door hinges.
25 Aug 08

More interior work.
         
   