This is the construction log for my Rans S-6S Taildragger kitplane.
23 Dec 2007
Inventory started. Very impressed so far with the quality of Rans' packing.
24 Dec 2007
Inventory almost complete. Garage is full!
27 Dec 2007
Inventory. Looked at some parts. Organized.
28 Dec 2007
Started riveting the
rudder pedals.
29 Dec 2007
Rudder pedals.
Horizontal Stab.
2 Jan 08
More horiz. stab.
updated 3 Jan 08
8 Jan 08
Finished R horiz stab.
finished L and R elev.
9 Jan 08
Built the elevator trim tab
10 Jan 08
Built the rudder and control horns.
15 Jan 08
Framed up the left side horiz stab.
16 Jan 08
Finished the left horiz stab!
updated
...21 Jan 08
28 Jan 08
Received my new fusealge
(original was damaged by the shipping company)
2 Feb 08
Prepped the garage to spray the fuse with epoxy primer.
5 Feb 08
First coat of epoxy primer on fuselage.
6 Feb 08
Second coat of epoxy primer. Lookin' good!
18 Feb 08
Painted the white Aerothane on the fuselage
19 Feb 08
Added doublers to longerons. Riveted on angle brakets.
20 Feb 08
Rear tailcone started!
21 Feb 08
More tailcone work!
22 Feb 08
Tailwheel mounting plate.
27 Feb 08
Bolted on tailwheel plate.
28 Feb 08
Lot of work on tail. Inside gussets and rear bulkhead installed and riveted.
3 Mar 08
Installed the cross cables in the rear fuselage.
6 Mar 08
Left side stringer.
Rear end channel riveted on!
10 Mar 08
Aft baggage compartment.
Right side stringer.
15 Mar 08
Riveted the tailcone to the steel cage. Started fitting T/W pieces together.
23 Mar 08
Finished the baggage frame. Door is next.
24 Mar 08
Working on rear vertical stab spar.
Painted TW pieces black.