| Installed the glove box door and transponder support brackets. | |
|
|
Aligned and drilled the glove box door. |
|
|
Installed the transponder support brackets. These will get riveted to the instrument panel with flush rivets and then filled with bondo to hide the rivets. |
|
|
Later today or tomorrow I will drill the holes for the glove box itself. |